Panther Print

New Construction at Palo Verde

Back to Article
Back to Article

New Construction at Palo Verde

by Alexandria Margo and Joseph David

Hang on for a minute...we're trying to find some more stories you might like.


Email This Story






New construction is underway at Palo Verde. Construction is taking place on the roof and will eventually spread throughout the school.

The purpose of the construction is to install a new air conditioner system.  Every few years Palo needs an update to its AC system.

“All of the major components of heating and cooling were set to be replaced”, stated Mr. Dalton, activity administrator at Palo.  Students will welcome this new development and feel refreshed as they tune in to their classrooms.

After the installation of the air conditioner in the spring the boiler will be updated as well.

Overall the construction period will last till the end of the school year into the beginning of summer break.

The cost of these advancements is covered in the school district’s general funds and is estimated to be around twenty million dollars.

Palo Verde will be going under construction throughout the 2017-2018 school year. This construction will surely make life more easier and comfortable for all staff and students at Palo.

Print Friendly, PDF & Email
Leave a Comment

If you want a picture to show with your comment, go get a gravatar.




*

Navigate Left
  • New Construction at Palo Verde

    OPINIONS

    I am Too Young

  • New Construction at Palo Verde

    books

    Looking for Alaska review

  • New Construction at Palo Verde

    events & competitions

    Palo’s Winter Dance Showcase

  • New Construction at Palo Verde

    FEATURES

    Palo’s Blood Drive

  • New Construction at Palo Verde

    ENTERTAINMENT

    Robin Hood review

  • New Construction at Palo Verde

    FEATURES

    A Tribute to George H.W. Bush

  • New Construction at Palo Verde

    ENTERTAINMENT

    Bohemian Rhapsody review

  • New Construction at Palo Verde

    OPINIONS

    Why Americans Should Buy American Cars

  • New Construction at Palo Verde

    books

    “The Sun is Also a Star” review

  • New Construction at Palo Verde

    lifestyle

    Winter is Coming to Vegas… Are You Prepared?

Navigate Right
The student news site of Palo Verde High School
New Construction at Palo Verde